Project Report on CHITIN & CHITOSAN FROM PRAWN SHELL WASTE [COD NO.1630]

Project Report on CHITIN & CHITOSAN FROM PRAWN SHELL WASTE [COD NO.1630]

35000 INR/Piece

Product Details:

X

Project Report on CHITIN & CHITOSAN FROM PRAWN SHELL WASTE [COD NO.1630] Price And Quantity

  • 35000 INR/Piece
  • 1 Piece
  • COD NO.1630
  • Off White to Pale White
  • >85% (as acetate salt)
  • >90%
  • Technical, Food, Pharma
  • HDPE bags, fiber drums, 25 kg net
  • Cool, dry place, away from direct sunlight
  • Dependent on raw material quality, typical 15-25%
  • 2 years (when properly stored)
  • Typically 75-90%
  • Market Survey, Manufacturing Process, Project Economics, Machinery Details, Raw Material Suppliers, Financial Analysis, Plant Layout
  • Deproteinization, Demineralization, Decolorization, and Deacetylation steps
  • Printed or Digital PDF
  • 100-200 mesh
  • Customizable (as per project requirement)
  • Less than 10%
  • Pharmaceutical, Food, Agriculture, Cosmetics, Water Treatment
  • Soluble in dilute acids, insoluble in water
  • Prawn Shell Waste
  • CHITIN & CHITOSAN FROM PRAWN SHELL WASTE
  • English
  • Chitin, Chitosan

Project Report on CHITIN & CHITOSAN FROM PRAWN SHELL WASTE [COD NO.1630] Trade Information

  • 1 Piece Per Day
  • 2-3 Days
  • All India

Product Description

CHITIN & CHITOSAN FROM PRAWN SHELL WASTE [COD NO.1630]

     Chitin is a  white, hard, inelastic, nitrogenous, polysaccharide found in the outer skeleton of insects, crabs, shrimps and lobsters and in the internal   structures of invertebrates. It is the second most abundant  organic  compound next to cellulose. It is a macro molecular linear polymer of_ (1-4)  N acetyl D glucosamine and is insoluble in water  and many organic solvents. Chitin itself has only a few applications; it acts more as a  precursor  of  Chitosan,  its  most   familiar derivative.

COST ESTIMATION

Plant Capacity                                         560.00 Kgs/Day
Land & Building ( 4000 Sq.Mtrs)                  Rs. 2.24 Cr
Plant & Machinery                                    Rs.2.06 Cr        
W.C. for 3 Months                                    Rs. 1.08 Cr       
Total Capital Investment                            Rs. 5.55 Cr             
Rate of Return                                         59%  
Break Even Point                                      57%

Note: ITI can modify the Capacity and Project Cost based on your requirement.

Contents of the Project Reports

Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart
Projected Balance Sheet for 5 Years etc.


Get in touch with us
RFQ Request For Quotation
Get Quotes For Your Buying Requirement. Tell Suppliers What You Need.
I agree to abide by all the Terms and Conditions of tradeindia.com