Project Report on Full Body & Chassis Bus Plant (Eiri-1076)

Project Report on Full Body & Chassis Bus Plant (Eiri-1076)

35000 INR/Piece

Product Details:

X

Project Report on Full Body & Chassis Bus Plant (Eiri-1076) Price And Quantity

  • 1 , , Piece
  • 35000 INR/Piece
  • Paperback
  • English
  • Process Flow Diagram, Machinery Details, List of Plant & Machinery, Power & Water Requirement, Pollution Control Measures
  • For entrepreneurs, consultants, industrialists, and investors seeking project feasibility and business guidance
  • Industrial Project Report
  • Provided on request
  • Detailed project report for setting up a Full Body & Chassis Bus Manufacturing Plant
  • Project Profile, Market Survey, Manufacturing Process, Plant Layout, Technical & Financial Analysis, Personnel Requirements, Raw Materials & Utilities, Projected Balance Sheets, Investment Opportunity
  • Approximately 150-200 pages
  • EIRI-1076
  • Project Report on Full Body & Chassis Bus Plant (Eiri-1076)

Project Report on Full Body & Chassis Bus Plant (Eiri-1076) Trade Information

  • 1 , , Piece Per Day
  • 2-3 Days
  • All India

Product Description

Full Body & Chassis Bus Plant (Eiri-1076)
Automobiles  body  building units generally specialize in  a  few types of vehicles for  example a body building workshop of small capacity can under take either trucks or buses of standard design or mini buses or delivery vans or similar other vehicles used for commercial   transportation   of   goods   &    passengers.   But sufficiently  big auto body building factories can under  take  a range  of chassis's for constructing and mounting body  on  them. Auto  body building involves a lot of structural designs  wood  & metal working  processes fastening techniques surface  production measures   arranging   various    accessories   and   instruments electrical  and safety devices at proper places  such  a  factory requires  to  be  fully equipped with full  range  of  wood/metal working machines and tools, treating and testing equipments high level  of  productivity and quality oriented team and  much  more facilities indeed. Body building is a labour oriented work  where all  calibres  of  personnel's and hard   working  labourers  are treated as assets.
Cost Estimation
Plant Capacity 8 Nos./Day
Land and Building (Area 10 Acres)  Rs. 4.42 Cr.
Plant & Machinery  Rs. 1.14 Cr.         
W.C. for 3 Months  Rs. 43.74 Cr.           
Total Capital Investment  Rs. 50.61 Cr.              
Rate of Return  67%   
Break Even Point 24%

Note: ITI can modify the Capacity and Project Cost based on your requirement.

Contents of the Project Reports

Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart
Projected Balance Sheet for 5 Years etc.

Other Products in 'Industrial Project Reports' category



Get in touch with us
RFQ Request For Quotation
Get Quotes For Your Buying Requirement. Tell Suppliers What You Need.
I agree to abide by all the Terms and Conditions of tradeindia.com