Project Report on Iron Ores Pelletization Plant [Eiri-1170]

Project Report on Iron Ores Pelletization Plant [Eiri-1170]

35000 INR/Piece

Product Details:

X

Project Report on Iron Ores Pelletization Plant [Eiri-1170] Price And Quantity

  • 35000 INR/Piece
  • 1 Piece
  • Technical Details, Market Survey, Feasibility Study, Financials, Process Details, Machinery Details, Raw Materials, Quality Control
  • Authentic government and industry sources
  • Varies as per project specification
  • Printed & Soft Copy Available
  • Engineers India Research Institute (EIRI)
  • Iron Industry / Mining
  • EIRI-1170
  • Project Reports
  • Customized as per scope
  • For entrepreneurs, consultants, companies, research institutes
  • Project Report on Iron Ores Pelletization Plant [Eiri-1170]
  • English
  • Available for Capacity & Process Requirements
  • Available
  • Process flow diagram, plant layout
  • Feasibility, Planning, Investment, Industrial Setup

Project Report on Iron Ores Pelletization Plant [Eiri-1170] Trade Information

  • 1 Piece Per Day
  • 2-3 Days
  • All India

Product Description

Iron Ores Pelletization Plant [Eiri-1170]
Iron Ore Pellets are used in blast furnaces for producing sponge iron & steels. Marked by high productly lower fuel consumption and improved furnace control, pellets are now preferred all over the world for primary steel making. An iron ore pelletization unit can submit an IEM to SIA of ministry of Steel Industry to set-up a plant of mfg. capacity  = 18 lakh tonners pa. This project sould be 100% EOU/EOU or an ancillary to a sponge iron plant. This plant can be set-up near an iron ore concentration site or a sponge iron plant or near a sea port for respective benefits of transportation costs saving on transfer of raw materials and /or finished products in between the point of importance & the plant. If it is near iron ore concentration plant raw materials transportation bill will be reduced. If set up near a sponge iron plant the cost of delivering pelletized products to the user plant will be small. Similarly in case of EOU project its being near a sea port will be beneficial. Except some critical equipments which necessarily need to be imported all other equipments required for the project are indigenously available. The technical know how, for an energy efficient, pollution-free and highly productive sophisticated pelletizing plant is not fully available from indigenous sources. However the unit will be readily permitted to import  technical  know how in the form of  designs/drawings  and expertise form foreign companies. RBI will automatically give clearance for technical/financial collaboration. Depending on the size of the project connected electric power load reqd. may be about 5 mw to 25 mw, besides 100000 Kls/pa of fuel oil.

Cost Estimation

  • Plant Capacity 500 MT./Day
  • Land & Building (Area 1,20,000 sq.mt.)  Rs. 102.76 Cr.
  • Plant & Machinery  Rs. 35.36 Cr.         
  • W.C. for 2 Months  Rs. 19.70 Cr.           
  • Total Capital Investment  Rs. 160.97 Cr.              
  • Rate of Return  36%   
  • Break Even Point 40%


Note: ITI can modify the Capacity and Project Cost based on your requirement.

Contents of the Project Reports

Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart
Projected Balance Sheet for 5 Years etc.

Other Products in 'Industrial Project Reports' category



Get in touch with us
RFQ Request For Quotation
Get Quotes For Your Buying Requirement. Tell Suppliers What You Need.
I agree to abide by all the Terms and Conditions of tradeindia.com