Project Report on Plastic Water Storage Tanks [Eiri-1487]

Project Report on Plastic Water Storage Tanks [Eiri-1487]

35000 INR/Piece

Product Details:

X

Project Report on Plastic Water Storage Tanks [Eiri-1487] Price And Quantity

  • 1 Piece
  • 35000 INR/Piece
  • Engineers India Research Institute
  • Report can be customized as per client requirement
  • Project Report on Plastic Water Storage Tanks (Eiri-1487)
  • Detailed manufacturing process, machinery details, cost estimation, quality control, utility requirements
  • Project profile, manufacturing process, process flow diagram, plant & machinery, raw material, detailed project report, market survey, financials, suppliers information, etc.
  • Plastic Water Storage Tanks
  • After-sales consulting available
  • 140 pages
  • Both digital (PDF) and print versions available
  • EIRI-1487
  • In stock
  • 2024
  • English
  • Guidance for setting up manufacturing unit of plastic water storage tanks
  • Includes projected balance sheets, cash flow, profit & loss, break-even analysis
  • Entrepreneurs, Industrialists, Consultants, Researchers
  • Plastic Processing, Water Storage Solutions
  • Paperback/Hardbound/Soft Copy

Project Report on Plastic Water Storage Tanks [Eiri-1487] Trade Information

  • 1 Piece Per Day
  • 2-3 Days
  • All India

Product Description

Plastic Water Storage Tanks [Eiri-1487]

The term Plastics usually refers to a large and varied group of synthetic materials which are solid in finished form but at some stage in their processing are fluid enough to be shaped by application of heat and pressure. The use of plastics in building has grown rapidly in the last few years. Plastics were first used for decorative and non structural purposes but because of increased knowledge of the long term properties of plastics particularly resistance to creep and environmental effects some plastics are now available that maintain long term structural integrity, such as piping, doors and windows, water tanks that can contain moderate pressures for a long period of time. During the last decade Plastic (conversion) Industry has progressed at a fast rate. New fields of application of plastics are continually being developed. Tile sometime ago drums, barrels were conventionally manufactured out of M.S. Sheets. Today we can get the drum and barrel made out of Plastics. Blow moulding has been the most widely used method of the manufacture of hollow-ware out of thermoplastics. The choice of plastic types and formulations now run in thousands and this diversity indeed appears formidable. It is easier to cope with this diversity if plastics are considered to be a category of materials like metals embracing different distinct families in which each family, in turn is composed of many individual types. Inspite of the diversity of plastics being great, in practice the choice for a given application will normally lie between a narrow band of plastic spectrum. Within this band there may be several plastics which approximate the desired requirements. Selection of the best one out of these, requires weighing and comparing the properties of each.

Cost Estimation

Plant Capacity                               30 Nos./Day
Land & Building (4000 sq.mt.)       Rs. 30 Lacs
Plant & Machinery                         Rs. 1.14 Cr.        
W.C. for 3 Months                         Rs. 69 Lacs          
Total Capital Investment                  Rs. 2.22 Cr.             
Rate of Return                                40%  
Break Even Point                            46%

Note: ITI can modify the Capacity and Project Cost based on your requirement.

Contents of the Project Reports

Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart
Projected Balance Sheet for 5 Years etc.

Other Products in 'Plastic Industries Project Reports' category



Get in touch with us
RFQ Request For Quotation
Get Quotes For Your Buying Requirement. Tell Suppliers What You Need.
I agree to abide by all the Terms and Conditions of tradeindia.com