Project Report on Pvc Wire And Cable (Eiri-0994)

Project Report on Pvc Wire And Cable (Eiri-0994)

35000 INR/Piece

Product Details:

X

Project Report on Pvc Wire And Cable (Eiri-0994) Price And Quantity

  • 35000 INR/Piece
  • 1 Piece

Project Report on Pvc Wire And Cable (Eiri-0994) Trade Information

  • 1 Piece Per Day
  • 2-3 Days
  • All India

Product Description

Pvc Wire And Cable (Eiri-0994)
Essential power cables used for transmission and distribution purposes consist of conductors stranded from plain high conductive annealed copper wires insulated with oil-impregnated paper tapes. The single or multicore assemble in them enclosed in an impermeable metal sheath and where necessary depending on installation conditions, the assembly is protected by steel armourings. Modern cable technology is still pursuing the above ideal, but today many other additional factors have also to be considered, as indicated in the following notes (dealing with oil impregnated paper insulated cables), which  are divided into three main parts, the Ist dealing with cable design, the second part outlines modern manufacturing methods and the third section  discusses installation requirements.
Cost Estimation
  • Plant Capacity  2400 Sq.Ft./Day
  • Land and Building (Area 2500 sq.mt.)  Rs. 1.47 Cr.
  • Plant & Machinery  Rs. 55 Lacs         
  • W.C. for 2 Months  Rs. 2.12 Cr.           
  • Total Capital Investment  Rs. 4.21 Cr.              
  • Rate of Return  55%   
  • Break Even Point 34%

Note: ITI can modify the Capacity and Project Cost based on your requirement.

Contents of the Project Reports

Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart
Projected Balance Sheet for 5 Years etc.

Other Products in 'Project report on plastic Technology' category



Get in touch with us
RFQ Request For Quotation
Get Quotes For Your Buying Requirement. Tell Suppliers What You Need.
I agree to abide by all the Terms and Conditions of tradeindia.com