Project Report on Steel Rolling Mill (Reinforcement Bar) (Eiri-0998)

Project Report on Steel Rolling Mill (Reinforcement Bar) (Eiri-0998)

35000 INR/Piece

Product Details:

X

Project Report on Steel Rolling Mill (Reinforcement Bar) (Eiri-0998) Price And Quantity

  • 35000 INR/Piece
  • 1 Piece
  • Relevant standards and compliances for steel rolling mill
  • Process description, machinery details, plant layout, quality assurance, material balance
  • Iron billets, steel scrap
  • Projected balance sheet, profit & loss, cash flow, depreciation
  • Power, water, fuel, labour
  • Specifies reinforcement bar output as per client requirement
  • Included in report
  • Available on request
  • Technical, Financial, and Market Feasibility Study

Project Report on Steel Rolling Mill (Reinforcement Bar) (Eiri-0998) Trade Information

  • 1 Piece Per Day
  • 2-3 Days
  • All India

Product Description

Steel Rolling Mill (Reinforcement Bar) (Eiri-0998)
Reinforcement bar also called deformed bar or reinforcing steel or reinforcement steel. It is a common steel bar, and is commonly used as tensioning device in Reinforced concrete and reinforced masonry structures holding the concrete in compression. It is usually formed from carbon steel and is given ridges for better mechanical anchoring into concrete. Reinforcement bar were known in construction well before the era of the modern reinforced concrete. Some 150 years before its invention, these bars were used to form the ear cass of leaning tower of Nevyansk in Russia, built on orders of industries Akinify devidove. Concrete is material that is very in strong in compression, but relatively weak  in tension to compensate for this  imbalance in concrete behavior, reinforcement bar is cast into carry the Tensile loads.
Cost Estimation (all fig. in US$)
  • Land & Building (Area 50000 Sq.Mt.)  US$ 1.09 Cr.
  • Plant & Machinery  US$ 33 Lacs         
  • W.C. for 1 Months  US$ 1.47 Cr.           
  • Total Capital Investment  US$ 2.89 Cr.              
  • Rate of Return  96%   
  • Break Even Point 44%


Note: ITI can modify the Capacity and Project Cost based on your requirement.

Contents of the Project Reports

Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machinery's and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart
Projected Balance Sheet for 5 Years etc.

Other Products in 'Industrial Project Reports' category



Get in touch with us
RFQ Request For Quotation
Get Quotes For Your Buying Requirement. Tell Suppliers What You Need.
I agree to abide by all the Terms and Conditions of tradeindia.com